Safety light curtain|Belt Sway Switches|Pull Rope Switch|ultrasonic flaw detector-Shandong Zhuoxin Machinery Co., Ltd

Conveyor switch

Bi-directional pull rope switch PJZS-3145S/2, conveying industry PJZS-3145S/2

In the event of an emergency accident at the site of the PJZS-3145S/2 conveyor belt conveyor in the conveying industry, the steel wire rope tied to the hanging ear is pulled at any position along the line, forcing the internal cam of the machine to rotate and driving the microcomputer switch to act, issuing a shutdown signal to achieve the shutdown effect and prevent the accident from expanding.

  • Bi-directional pull rope switch PJZS-3145S/2 for conveying industry
  • ZHUOXIN
  • 24-380v
  • IP65
  • TT, Paypal, Credit card, Western union
  • +86-15163766288
  • In the event of an emergency accident at the site of the PJZS-3145S/2 conveyor belt conveyor in the conveying industry, the steel wire rope tied to the hanging ear is pulled at any position along the line, forcing the internal cam of the machine to rotate and driving the microcomputer switch to act, issuing a shutdown signal to achieve the shutdown effect and prevent the accident from expanding.

Description

Conveyor switch

The bi-directional rope switch PJZS-3145S/2 for the conveying industry is composed of a pull rod, a reset handle, a cam, a locking groove, and a micro switch. The pull rope switch is installed on the frames on both sides of the belt conveyor, and is connected along both sides of the conveyor with a steel wire rope. When an emergency occurs in the conveyor belt equipment, the steel wire rope is pulled at any location along the site, and the steel wire rope drives the drive arm to rotate. The precision cam is displaced by the torque spring driven by the transmission shaft, and the micro switch is driven to cut off the control line, causing the conveyor to stop running. The installation and adjustment rope switch should be installed in a location with maintenance channels on both sides of the conveyor, and the installation position should ensure that maintenance personnel can operate conveniently in emergency situations. 1. Fix the rope switch on the rack. 2. The distance between the two switches on one side is about 50m, using a diameter ofΦ The steel wire rope connection of 4 should have moderate elasticity. 3. To reduce the impact of the weight of the steel wire rope on the start of the switch, a support ring is installed on the frame every 3 meters to support the steel wire rope. 4. The other end of the steel wire rope is tied to the tension spring (fixed with a rope buckle), and the tension on both sides of the rope is tightened using a tightener without affecting normal use, ensuring that the tension on both sides is balanced. (Note: For the climbing section conveyor, the switch spacing and rope length should be minimized as much as possible.) Precautions: 1. Cut off the main power supply first, and then use a multimeter to measure the live wire. The switch must be installed at one end of the live wire. 2. Cut the live wire in a suitable place, and there are two joints, and the pull switch also has two joints. 3. Peel off the two joints of the live wire and expose the metal wire, and connect them to either of the two joints of the switch. 4. Cut off the excessively long metal wire at the connected joint to prevent two metal wires from colliding and short circuiting. 5. Loosen the cover of the pull switch and you can see a metal shaft with a hole at one end. 6. There is also a hole on the side of the plastic casing of the pull switch. First, pass the pull wire through the opening of the plastic casing to introduce the pull wire into the pull switch. Then, insert one end of the introduced pull wire into the shaft and tie a knot. Shorten the excessively long pull wire after tying. 7. Rotate the cover of the cable switch to prevent electric shock. Technical parameters 1. Environmental conditions for use a. Environmental temperature: -30 ℃~70 ℃ b. Relative humidity not exceeding 85% Protection level; IP67 shell material, aluminum alloy surface, precision baked paint, transmission rod material, stainless steel cable required tension 49± 10N (5± 1kgf) number of connections; 2-point capacity; 250V AC 5A wiring port; Applicable temperature for 6-12mm cable- 20 ℃~+60 ℃ Service life 20000 times Warranty period 1 year Warranty

Tags

Get the latest price? We'll respond as soon as possible(within 12 hours)
主站蜘蛛池模板: 光纤测温-荧光光纤测温系统-福州华光天锐光电科技有限公司 | 丹佛斯压力传感器,WISE温度传感器,WISE压力开关,丹佛斯温度开关-上海力笙工业设备有限公司 | 飞行者联盟-飞机模拟机_无人机_低空经济_航空技术交流平台 | 飞扬动力官网-广告公司管理软件,广告公司管理系统,喷绘写真条幅制作管理软件,广告公司ERP系统 | 氧氮氢联合测定仪-联测仪-氧氮氢元素分析仪-江苏品彦光电 | 磁力抛光机_磁力研磨机_磁力去毛刺机-冠古设备厂家|维修|租赁【官网】 | 温控器生产厂家-提供温度开关/热保护器定制与批发-惠州市华恺威电子科技有限公司 | 防堵吹扫装置-防堵风压测量装置-电动操作显示器-兴洲仪器 | 小型手持气象站-空气负氧离子监测站-多要素微气象传感器-山东天合环境科技有限公司 | 山东商品混凝土搅拌楼-环保型搅拌站-拌合站-分体仓-搅拌机厂家-天宇 | 地脚螺栓_材质_标准-永年县德联地脚螺栓厂家 | 深圳宣传片制作-企业宣传视频制作-产品视频拍摄-产品动画制作-短视频拍摄制作公司 | 衬四氟_衬氟储罐_四氟储罐-无锡市氟瑞特防腐科技有限公司 | 合肥弱电工程_安徽安防工程_智能化工程公司-合肥雷润 | PCB厂|线路板厂|深圳线路板厂|软硬结合板厂|电路板生产厂家|线路板|深圳电路板厂家|铝基板厂家|深联电路-专业生产PCB研发制造 | 北京开业庆典策划-年会活动策划公司-舞龙舞狮团大鼓表演-北京盛乾龙狮鼓乐礼仪庆典策划公司 | 黑田精工电磁阀-CAMMOZI气缸-ROSS电磁-上海茂硕机械设备有限公司 | 湿地保护| 南京办公用品网-办公文具用品批发-打印机耗材采购 | 北京模型公司-军事模型-工业模型制作-北京百艺模型沙盘公司 | 无纺布包装机|径向缠绕包装机|缠绕膜打包机-上海晏陵智能设备有限公司 | led冷热冲击试验箱_LED高低温冲击试验箱_老化试验箱-爱佩百科 | 塑料造粒机「厂家直销」-莱州鑫瑞迪机械有限公司 | 臭氧发生器_臭氧消毒机 - 【同林品牌 实力厂家】 | 求是网 - 思想建党 理论强党| 电动葫芦|环链电动葫芦-北京凌鹰名优起重葫芦 | PVC地板|PVC塑胶地板|PVC地板厂家|地板胶|防静电地板-无锡腾方装饰材料有限公司-咨询热线:4008-798-128 | 低粘度纤维素|混凝土灌浆料|有机硅憎水粉|聚羧酸减水剂-南京斯泰宝 | 石膏基自流平砂浆厂家-高强石膏基保温隔声自流平-轻质抹灰石膏粉砂浆批发-永康市汇利建设有限公司 | 急救箱-应急箱-急救包厂家-北京红立方医疗设备有限公司 | 液氮罐(生物液氮罐)百科-无锡爱思科| 奇酷教育-Python培训|UI培训|WEB大前端培训|Unity3D培训|HTML5培训|人工智能培训|JAVA开发的教育品牌 | 涡轮流量计_LWGY智能气体液体电池供电计量表-金湖凯铭仪表有限公司 | 钢托盘,铁托盘,钢制托盘,镀锌托盘,饲料托盘,钢托盘制造商-南京飞天金属13260753852 | 流水线电子称-钰恒-上下限报警电子秤-上海宿衡实业有限公司 | 防爆暖风机_防爆电暖器_防爆电暖风机_防爆电热油汀_南阳市中通智能科技集团有限公司 | 苏州伊诺尔拆除公司_专业酒店厂房拆除_商场学校拆除_办公楼房屋拆除_家工装拆除拆旧 | 水冷式工业冷水机组_风冷式工业冷水机_水冷螺杆冷冻机组-深圳市普威机械设备有限公司 | 西安展台设计搭建_西安活动策划公司_西安会议会场布置_西安展厅设计西安旭阳展览展示 | 物流之家新闻网-最新物流新闻|物流资讯|物流政策|物流网-匡匡奈斯物流科技 | 烟台条码打印机_烟台条码扫描器_烟台碳带_烟台数据采集终端_烟台斑马打印机-金鹏电子-金鹏电子 |